FALKONET VINACCIERE 1:48

Hello Everyone

This week we made good progress. After the "potdeksel" was put into position, the various deck fittings came next:

WeChat Image_20201021084156.jpg

The platform for the kaapstander, the first two deck cleats and "box" around the mast are already in place.

WeChat Image_20201021084043.jpg

Here, all the deck fittings have been placed into position. These included a further four cleats, four blackened hooks at each corner of the mast box, the kaapstander, two hawser holes (not visible) and then the cabin for the kapitein and helmsman, the two cargo loading hatches and the front hatch for the crew.

After that it was a final sanding and then mixture of 30% tung oil and 70% mineral terpentijn.

WeChat Image_20201021083936.jpg

Bakboord kant. Die Leudo staan op die Chinese lijm wat ek gebruik - uitstekende produk!

WeChat Image_20201021083912.jpg

Stuurboord.

WeChat Image_20201021083919.jpg

In natuurlike lig.

WeChat Image_20201021083941.jpg


Dek aan boegkant.

WeChat Image_20201021083847.jpg


Middelste gedeel

Vanaand laat die forum my net 7 plaatjes toe.

Word vervolg - Heinrich
 

Bijlagen

  • WeChat Image_20201021084156.jpg
    WeChat Image_20201021084156.jpg
    175,2 KB · Weergaven: 121
  • WeChat Image_20201021083936.jpg
    WeChat Image_20201021083936.jpg
    184,3 KB · Weergaven: 116
  • WeChat Image_20201021083936.jpg
    WeChat Image_20201021083936.jpg
    184,3 KB · Weergaven: 116
Back
Top